percentage of impervious surface area _____% width of corridors fire fighting and safety facilities percentage of unpaved surface area _____% distance to fire exits smoke detectors others (specify) _____ access to public street emergency lights addre
4 escutcheons for scanDinavian lock cases Escutcheon LH002 A, P, O Material: brass Material: 002 A also stainless steel Surface finishes: polished, chrome, satin chrome, satin brass Cover plate LH007 P
7. Philippe Lalanda - 2017 Quality model A quality model defines a set of quality attributes (and metrics) for system evaluation implies classification and terminology many different models have been defined (ISO 9126) no consensus often domain -depe
Lock Architectural Shanghai Tong Lee Hardware | Product Catalogue 2018-2019 ... EA 491 CS-XL Tubular Lever Lock Backset : with adjustable latch 60mm-70mm Functions
Contents 1 Introduction 1 1.1 ... Semantics of architectural connectors like Client-Server Connectors, Shared ... Following table summarizes common packaging
sanitary / plumbing permit date of application date issued ... grease trap bar sink ... deep well & pump set septic vault/imhoff tank street canal
OFFICE OF THE BUILDING OFFICIAL
ARCHITECTURAL PERMIT Application No.
AP No.
Building Permit No.
Box 1 (To be accomplished in print by the Owner/Applicant) LAST NAME
OWNER/APPLICANT FOR CONSTRUCTION OWNED BY AN ENTERPRISE NO. ADDRESS
Box 2 (To be accomplished by the Design Professional) 1. ARCHITECTURAL FACILITIES AND OTHER FACILITIES PURSUANT TO BATAS PAMBANSA BILANG 344, REQUIRING CERTAIN BUILDINGS, INSTRUCTIONS, ESTABLISHMENTS AND PUBLIC UTILITIES TO INSTALL FACILITIES AND OTHER DEVICES STAIRS
WASH ROOMS & TOILETS
WALKWAYS
LIFTS/ELEVATORS
CORRIDORS DOORS, ENTRANCES, & THRESHOLDS
SWITCHES, CONTROLS, BUZZERS
DRINKING FOUNTAINS
RAMPS
HANDRAILS THRESHOLDS
PUBLIC TELEPHONES SEATING ACCOMODATIONS
PARKING AREAS
FLOOR FINISHES
OTHERS (Specify)
3. CONFORMANCE TO FIRE CODE OF THE PHILIPPINES (P.D. 1185)
2. PERCENTAGE OF SITE OCCUPANCY PERCENTAGE OF BUILDING FOOTPRINT PERCENTAGE OF IMPERVIOUS SURFACE AREA PERCENTAGE OF UNPAVED SURFACE AREA OTHERS (Specify)
% % % %
NUMBER & WIDTH OF EXIT DOORS
FIREWALLS
WIDTH OF CORRIDORS
FIRE FIGHTING AND SAFETY FACILITIES
DISTANCE OF FIRE EXITS
SMOKE DETECTORS
ACCESS TO PUBLIC STREET
EMERGENCY LIGHTS
OTHERS(Specify)
Box 4
Box 3 DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS
SUPERVISOR / IN-CHARGE OF ARCHITECTURAL WORKS
Date
ARCHITECT
(Signed and Sealed over Printed Name)
Address PRC No. PTR No. Issued at Box 5 Building Owner
(Signed and Sealed over Printed Name)
Address PRC No. PTR No. Issued at Box 6 WITH MY CONSENT
Validity Date Issued TIN
(Signature Over Printed Name) Date Address CTC No.
Date
ARCHITECT
Date Issued
Validity Date Issued TIN LOT OWNER
(Signature Over Printed Name) Date Place Issued
Address CTC No.
Date Issued
Place Issued
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION Box 7
DATE
RECEIVED BY
FIVE (5) SETS OF ARCHITECTURAL DOCUMENTS
1. VICINITY MAP/LOCATION PLAN WITHIN A TWO KILOMETER RADIUS 2. SITE DEVELOPMENT PLAN
8. DETAILS OF RAMPS, PARKING FOR THE DISABLED, STAIRS FIRE ESCAPES, CABINETS AND PARTITIONS 9. SCHEDULE OF DOORS AND WINDOWS
3. PERSPECTIVE
10. SCHEDULE OF FINISHES FOR FLOORS, CEILING AND WALLS
4. FLOOR PLANS
11. ARCHITECTURAL INTERIOR
5. ELEVATIONS, AT LEAST FOUR (4)
12. SPECIFICATIONS
6. SECTIONS, AT LEAST TWO (2)
13. COST ESTIMATE
7. CEILING PLANS SHOWING LIGHTING FIXTURES AND DIFFUSERS
14. OTHERS (Specify)
Box 8
PROGRESS FLOW IN
OUT
PROCESSED BY: DATE
TIME
DATE
TIME
ARCHITECTURAL DRAWINGS
ROMMEL C. JARDIN
SPECIFICATIONS
Chief, Building Code Section
OTHERS (Specify) Box 9
ACTION TAKEN: PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING: 1.That under Article 1723 of the Civil Code of the Philippines, the architect (and engineer) who drew up the plans and specifications for the building/structure is responsible for damages if within fifteen (15) years from completion of the building/structure, the same should collapse due to defect in the plans or specification or defects in ground. The engineer or architect who supervises the construction shall be solidarity liable with the contractor should the edifice collapse due to defect in the construction or the use of inferior materials. 2. That the proposed architectural works shall be in accordance with the architectural plans filed with this office and in conformity with latest Architectural Code of the Philippines, the National Building Code and its IRR. 3. That prior to any construction activity, a duly accomplished prescribed “Notice of Construction” shall be submitted to the Office of the Building Official. 4. That upon completion of the construction, the licensed full time inspector and supervisor in-charge of construction works shall submit the entry to the logbook duly signed and sealed to the Building Official including as-built plans and other documents, and shall also accomplish the Certificate of Completion stating that the architectural works conform to the provisions of the Architectural Code of the Philippines, the National Building Code and its IRR. 5. That this permit is null and void unless accompanied by the building permit.
PERMIT ISSUED BY: MACARIO A. SEGUNDO JR. City Engineer/Building Official Date _________________