The overall total man-days worked in Sept 2013 were 200 man-days inclusive of site visits ... platform that was not included in the CHP book and map. ...

0 downloads 35 Views 411KB Size
GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING Date : 2 Oct 2013

Reference # : G110-662

Datuk Sam Mannan Director of Forestry Sabah Forestry Department Locked Bag No 68 90009 Sandakan, Sabah Tel : 089-660-811 Fax : 089-669-170 Dear Datuk Sam,

Re: Summary Report : TLAS & RIL monitoring project - Sept 2013 GFS has completed the Sept 2013 scheduled RIL audits and TLAS assessment according to the revised SFD Schedule. The submitted RIL reports for each compartment & TLAS reports for SFMLAs assessed includes: FMU # 15 Form 1

Audit Dates 2-6 Sept 2-6 Sept

CHP Cpt#

RIL Cpt# 321 3

Form 1

2-6 Sept

Block 1

12 20 20 20 16 16 16 24 24 11 17A 17B 17A 17B 17B Total Total

2-6 Sept 9-13 Sept 9-13 Sept 9-13 Sept 17-20 Sept 17-20 Sept 17-20 Sept 23-26 Sept 23-26 Sept 2-5 Sept 9-13 Sept 9-13 Sept 9-13 Sept 9-13 Sept 9-13 Sept RIL TLAS

H(B) 41 479

TLAS TLAS TLAS TLAS TLAS TLAS 1 NA

S3 589 157 172 193 424 TLAS TLAS TLAS TLAS TLAS TLAS 11 NA

Licensee RBJ (Gasin Selatan) Chok Brothers (Paradigma Istemewa) Andaun Tangkap dan 11 Peserta (Elite Espirit) Makmuran RBJ (Maxland) RBJ (Asiatic Lumber) RBJ (Asiatic Lumber) RBJ (Tamabina) RBJ (Eramewa) RBJ (Eramewa) RBJ (WInmore) RBJ (Winmore) KM Hybrid Lebihasil Lebihasil Maxland Maxland Maxland

Report # G110-650 G110-651 G110-652 G110-653 G110-654 G110-655 G110-656 G110-657 G110-658 G110-659 G110-660 G110-661 G132-036 G132-037 G132-038 G132-039 G132-040 G132-041 12 6

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING The mandays for each FMU assessment has been detailed in the reports. The weekly summaries of mandays including site visits and reporting (2 days/report) are as follows: FMU # 15 / Form 1 11 20 16 24 17A & 17B Totals

Type RIL TLAS CHP / RIL RIL RIL TLAS

District / FR Tenom, Sook & Nabawan KM Hybrid Kinabatangan Tongod Kalabakan Lebihasil & Maxland

Audit Dates 2-6 Sept 2013 2-5 Sept 2013 9-13 Sept 2013 17-20 Sept 2013 23-26 Sept 2013 26-30 Sept 2013

Mandays 38 10 41 42 44 25 200

The total number of RIL compartments assessed in Sept 2013 was 12 and TLAS covered 5 SFMLA licensed areas. The overall total man-days worked in Sept 2013 were 200 man-days inclusive of site visits and reporting. Details on staff and man-days are recorded weekly, presented in each report and summarized in this document. A brief summary of highlights is attached for each RIL compartment and for the TLAS audits conducted in Sept 2013. GFS identifies the number of Major or Minor non-compliance as well as observations occurring in each compartment and report. GFS would like to request that scheduling be more oriented towards CHP and RIL implementation in compartments that are newly awarded to evaluate implementation at earlier stages of RIL. Please contact us if there are any questions on the submitted reports or recommendations by GFS Thank you and best regards,

Kevin T. Grace Director – Global Forestry Services Malaysia

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING RIL Summary Highlights – Sept 2013 Report #

FMU #

G110-650

15

G110-651

Form 1

Cmpt # 321

3

Summary Highlights (Major= 0, Minor=0, Observations=0) The assessing team evaluated four skid trails (SKT 14, SKT 12, SKT 4 and SKT 3) in FMU 15 Compartment 321 operated by Gasing Selatan. No gaps or observations were identified thus Gasing Selatan has complied with RIL requirements. (Major=0; Minor=0; Observations=0) Paradigma Istimewa has logged about 8% of Compartment 3 Area A for Chok Brothers Form 1 Licensed area. No gap or observation has been raised during the audit. However 6 observations raised during May 2013 audit were addressed by the contractor as stated below; Checklist 3.2/6.4: One culvert was observed on the ground but had not been marked on the CHP map at FR 2 (RX 736095; BOR 523311).The culvert requires maintenance to allow proper water drainage. Status: The CHP map has been updated to include all constructed culverts. Checklist 3.4: Improper drainage system was observed at FR 2 (RY 736338; BOR 523346), causing erosion of the road surface. Status: Side drains were consistently constructed and planks were installed to reduce the road surface disturbance during harvesting. Checklist 4.3: Improper directional felling observed at SKT 4 (RY 735811; BOR 523333) where the residual debris from tree crown (#1037 & #1038) is felled into seasonal creek. However, the contractor had taken an immediate action to clear out all residues from the seasonal creek. Status: The contractor had penalized by SFD (JPHTN/NN/4000/1/2/JLD.6/49; Dated: 29 July 2013) and taken corrective action to clear the seasonal creek from trees residual.

Checklist 5.2: There are evidence of unnecessary blading was observed in Compartment 3 at SKT 1, SKT 3 and SKT 4. This is based on the deep cuts into the terrain/soil. Status: The contractor had penalized by SFD (JPHTN/NN/4000/1/2/JLD.6/49; Dated: 29 July 2013).

Checklist 5.5: There are evidence shown that the operations were carried out during wet condition, soil and road conditions are not appropriate for conducting RIL in respect to minimize impacts and working hazards affecting safety issues. Status : The contractor had penalized by SFD (JPHTN/NN/400Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING 0/1/2/JLD.6/49; Dated: 29 July 2013).

G110-652

Form 1

Block 1

Checklist 6.1: Terrain according CHP map does not match with actual terrain conditions on the ground, which are very steep throughout the skid 0 trails (SKT 4; RX 735819 BOR 523335), inspected (gradient 35 ). Status: CHP map for Compartment 3 had been updated to include the actual alignments of skid trails on the ground. (Major=0; Minor=0; Observation=0) All harvesting operation by Elite Espirit in Block 1 under Form 1 License for Andaun Tangkap dan 11 Peserta has been completed since April 2013. However, the company has not applied for closing inspection from SFD. The contractor has rectified one observation, which was raised during the February 2013 audit (RIL Audit).

G110-653

12

H(B)

Checklist 2.2 : 4 additional skid trails were constructed after approval was given by SFD. Approval letter for additional skid trails should be provided during the audit. Status : Construction of 11 additional skid trails was approved by SFD and provided during the audit. (Major=0; Minor=0; Observations=0) Makmuran has logged about 8% of the 349 ha of Block H (B) in FMU 12. One observation was raised during the audit regarding a Log Fisher platform that was not included in the CHP book and map. There was no major or minor Gaps identified during the assessment. 0

G110-654

20

0

Checklist 2.5: A logfisher platform (N 04 27’ 24.6’’; E 116 01’ 02.1’’) was identified at SKT 6 but not included in CHP book and map. (Major = 0, Minor = 0, Observation = 0)

41

No gap or observation was raised during the RIL assessment of Maxland Sdn Bhd for FMU 20 Compartment 41. The assessing team has assessed two (2) main skid trails (SKT 2, SKT 31) and three (3) sub skid trails (SKT 2A, SKT 2B and SKT 2C). Total of 15 samples of stumps were checked on the ground.

G110-655

20

479

In respect to an issue raised during the previous CHP audit, the CHP contractor has updated the table of logging impact calculation on page 13. Maxland stopped operations during the RIL assessment due to safety reasons, however RIL activities needs to continue during RIL audits in order to allow the team to verify compliance to safety requirements of the standard. (Major=0; Minor=0; Observation=4) The CHP assessment of Asiatic Lumber Sdn Bhd for Compartment 479 in FMU 20 has resulted 4 observations: Checklist 2.2: 3 out of 19 trees checked on the ground were observed without tree tags at FR1. (Possibly tag number was brought back by the Document Control

Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING timber feller to the camp). Checklist 2.3: Summary information of volume per hectare (m3/ha) in the approved CHP (page 7) for Compartment 479 does not match with the 3 3 audit findings. (30.03m in CHP book; 38.72m audit findings). Checklist 6.1: Incomplete map as no road network was included in the map. Checklist 6.3: The term (medium road) used in the approved CHP map to specify a secondary road is not a standard term in RIL guidelines. The assessment team checked two feeder roads, one skid trail (FR02, FR01 and SKT 1) and three log landings (P1, P2 and P3). Most of the skid trails planned in this compartment are based on previous logging activities. G110-656

20

(Major = 0, Minor = 0, Observation = 1)

S3

The RIL assessment of Asiatic Lumber Industries Sdn Bhd for Compartment S3 has resulted one observation based on the insufficient constructions of drop zone 3 to accommodate 5,079 trees from the compartment area. The audit conducted recently at Compartment S3 in September 2013 was the first RIL audit. It has been over 1 year there is no logging activities carried out at this compartment after the CHP audit in March 2012 due to the coupe validity was expired and suspended by the SFD.

G110-657

16

589

The logging contractor has renewed their validity of block YLH 2/08 where st Compartment S3 is located until 31 January 2014 (ref. letter: JPHTN/PP/(5)100-26/2/KLT.6/85). (Major = 0, Minor = 2, Observation = 4) The assessment of Tamabina for FMU 16 Compartment 589 resulted in 2 Minor gaps and 4 observations based on skid trails alignment and unnecessary branches for SKT A28 and poor directional felling. Gaps: Checklist 4.3 (Minor gap): Improper felling technique was observed applied on 2 stumps observed on the ground (#F0137 at SKT C1 (RY 817133; BOR 572819) and #F0008 at SKT B4 (RY 817588; BOR 572294). 1 prohibited tree (BL, 68cm) was found damaged at SKT C2 (RY 817081; BOR 572889). Checklist 5.1 (Minor gap): 2 additional branches off SKT A28 were observed during the assessment that were not mapped or recorded in the CHP book. An approval letter was provided after the assessment; however the skid trails were not required as all 4 stumps were observed within 30m of the main skid trail, which could have been extracted using the cable. Document Control

Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING Alignment of SKT B4 (RY 817515; BOR 572220) observed on the ground does not correspond with the alignment marked in the CHP map.

G110-658

16

157

Observations: 1. Checklist 6.4: Number of culverts on the map differs from number on the ground. 1 culvert at FR1 was observed blocked with soil sediments (RY 817196; BOR 572632). 2. Checklist 4.1: 1 stump observed on the ground was not listed in the CHP book (F0002, S, 62cm). 4 stumps observed on the ground but not marked on the CHP map (#F0161, #F0162, #F0144 and #F1081). 3. Checklist 7.1: Based on evidence observed on the ground, the trained tractor operator did not followed RIL techniques for skidding of logs at SKT A28 that resulted in the construction of unnecessary skid trails. The tractor driver may need to under go retraining. 4. Checklist 8.2: Inconsistent construction of water bumps observed at SKT C1 (RY 817133; BOR 572699; Length: 80m; Slope°: 21°), SKT A27 (RY 817216; BOR 57291; Length: 60m; Slope°: 15°) and 1 additional SKT (RY 817120; BOR 572847; Length: 50m; Slope°: 17°). (Major= 0, Minor=0, Observation=0) No gap or observation was raised during the RIL assessment of Eramewah Sdn Bhd for Compartment 157 in FMU 16. Currently, 18% of the compartment area has been logged.

G110-659

16

172

As the logging activities within Compartment 157 were temporary ceased since October 2011, this area had been overgrown. Re-brushing of the boundaries, skid trail alignments and the signage of the infrastructure had been carried out to meet the RIL requirements before commencing their logging activities. (Major = 0, Minor = 0, Observation = 0) No gap or observation was raised during the RIL assessment of Eramewah Sdn Bhd for Compartment 172. Currently, 25% of the compartment area has been logged.

G110-660

23

193

As the logging activities within Compartment 172 were temporary ceased since October 2011, this area had been over grown. Re-brushing of the boundaries, skid trail alignments and the signage of the infrastructure had been carried out to meet the RIL requirements before commencing logging activities. (Major = 0, Minor = 0, Observation = 0) Logging activities by Winmore Development Sdn Bhd finished in March 2012 at FMU 24 compartment 193. The team did not raise any gaps or observations during the Sept 2013 close out visit. The contactor Document Control

Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING addressed 2 observations identified in the previous assessment in April 2012 as all stumps checked were identified with tree numbers and no hollow logs were observed. Winmore Development was permitted to fell 5 trees for demonstration of RIL using logfisher for a documentary film crew. GFS observed the contractor to use good directional felling techniques to fell 2 trees ((#1654; WS; 71cm & #1653; WS; 105cm). The field staff used protective equipment during felling and extraction of the logs with the Logfisher. The feller stabbed tree # 1653 to check if there the tree contained hollow bole prior to felling.

G110-661

24

424

Harvesting operation at Compartment 193 commenced in December 2010 and was completed in March 2012. However the compartment is still not been closed as the data for TDP was not clearly recorded for the compartment since they were combined with other compartments within the same Coupe License. Closing applications and inspections are recommended to be carried out within 6 months after logging operations are completed. This is to avoid missing of evidence such as tag on the stumps, faded tag numbers and rotten stumps. (Major Gaps=0; Minor Gaps=0; Observations=0). The assessing team did not able to conduct a full audit for Compartment 424 because the access road that leads to the compartment was inaccessible. The access road to the compartment passes through Sungai Kuamut, where the water volume of the river was too high to cross during the Sept audit. However, the team carried the audit by focusing on the updating contractor’s records and evaluation of equipment as listed below; 1. Total of trees felled in the Daily Felling Records 2. Check Scaling (CS) 3. Timber Disposal Permit (TDP) 4. Registration of machineries being utilized at Compartment 424 with the SFD 5. Safety and health (the contractor’s PPE and First Aid Kits) Status of Compartment 424: GFS has conducted a CHP audit in June 2013 followed by RIL implementation audit in August 2013. During the August 2013 assessment, no gap or observation was raised. Winmore Development Sdn Bhd had commenced their logging activities since July 2013. As per the recent audit, approximately 24% of the area has been logged, where 592 trees were felled. These logs are still located at log landing inside the compartment.

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING TLAS Summary Highlights & Results – Sept 2013 Report # G132036

FMU # 11

Summary Highlights & Results – KM Hybrid rd

th

When the 3 Supplemental Agreement was signed on 14 June 2012, 924.73 ha of KM Hybrid Plantation licensed area, which was burnt in August 2009 and March 2010, has been excised (C1, C4, and partly C3) from the Sook Plain Forest Reserve and an area of 741.48 ha (C2, C5, C6 and partly C3) is retained. In the same time, a total of 2,000 ha in Kuala Tomani Forest Reserve are as a replacement area for the compartments above. Since then, the licensee has dismantled gates located at the excised area, and erected a new gate at C2, demarcating and marking the new licensed boundary area within Sook Plan Forest Reserve and Kuala Tomani Forest Reserve. Km Hybrid is preparing a new FMP to include the new licensed area. To date, limited activities are being carried out at nd the retained area; ITP maintenance work is progress until 2 quarter only, as KM Hybrid Plantation has temporary ceased its activities in early June 2013 due to lack of funds from the company. Currently, no workers are residing within the licensed area. The current assessment of KM Hybrid Plantation has identified with the following highlights: 1. It is observed that the marking of new licensed boundary at C3 was not identifiable because of overgrown weeds. 2. Inconsistency of recording after carrying out forest security patrolling at the retained area, although no ITP activities.

Results: During September 2013 TLAS assessment, the percentage of indicators showing full or partial compliant for KM Hybrid Plantation Sdn Bhd was 100% and has complied with the Sabah TLAS to be classified as Verified Legal Compliant (VLC). The following table displays a breakdown of the various levels of compliance. Compliance Level Critical Non-Critical Sub-Total Total

Compliant Partial (1) (0.5) 7 NA 9 0 16 0 16

NonCompliant 0 0

Not Applicable 5 9

Total Criteria 12 18

Applicable Criteria 7 9

30

16

No GAPS were raised for partial and non-compliant indicators during the September 2013 assessment.

Recommendations: The following recommendations are made as follows; 1. Maintenance of licensed boundary should be carried out on a regular basis. This Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING is to ensure that it is visible and clear. 2. Forest Security Patrolling record book should be updated on a regular basis after boundary patrolling is conducted.

Report # G132037

FMU # 17A

Summary Highlights & Results – Lebihhasil - FMU 17A Lebihasil Sdn. Bhd. have scored 100% in the recent TLAS assessment for the year 2013. Currently Lebihasil are mainly focusing on the tending and maintenance of its planted areas specifically at C55 & C56. Trees above 4 years do not need any maintenance. Lebihasil have carried out replanting at the above compartment as deer’s ate the previous seedlings. Since the replanting activities are still on going (88.9%), update map for actual planted area has yet to be prepared. The licensee needs to take note with regards to one observation being raised; it is crucial for the licensee to segregate their waste between biodegradable and non-biodegradable before disposing into the landfills.

Results: During September 2013 TLAS assessment, the percentage of indicators showing full or partial compliant for Lebihasil Sdn. Bhd. (FMU 17 A) was 100% and has complied with the Sabah TLAS to be classified as Verified Legal Compliant (VLC). The following table displays a breakdown of the various levels of compliance. Compliance Level Critical Non-Critical Sub-Total Total

Compliant Partial (1) (0.5) 7 NA 15 0 22 0 22

NonCompliant 0 0

Not Applicable 5 3

Total Criteria 12 18

Applicable Criteria 7 15

30

22

No GAP was raised for partial and non-compliant indicators during the September 2013 assessment.

Recommendations: The following recommendations are stated as follows; a) Lebihasil need to update its map with the current tree species that are replanted to reflect the actual number of tree species being planted on the ground. Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING b) Monitoring of waste disposal needs to be carried out on a regular basis. This is to ensure that the non-biodegradable and biodegradable are segregated properly.

Report # G132038

FMU # 17B

Summary Highlights & Results – Lebihhasil - FMU 17B st

Upon completion of planting on the 1 extension area, Lebihasil Sdn. Bhd. was awarded nd nd a 2 extension area, where the Supplemental Agreement was signed on 22 November 2012 for an additional of 1,000 ha at Sg. Pinangah Forest Reserve for forest rehabilitation. To date, the total area under Lebihasil’s management is approximately 3,000 ha in size. Currently, the licensee has obtained an approval from Forestry Department to enter the area for the purpose of clearing and maintaining old existing th roads (Ref. letter #: JPHTN/DFR 700-2/1/19 KLT.1/46 dated 5 September 2013. Lebihasil (FMU 17B Area B) has achieved 100% in compliance with the September 2013 TLAS assessment. No gap was raised in this assessment.

Results: During September 2013 TLAS assessment, the percentage of indicators showing full or partial compliant for Lebihasil Sdn. Bhd. was 100% and has complied with the Sabah TLAS to be classified as Verified Legal Compliant (VLC). The following table displays a breakdown of the various levels of compliance. Compliance Level Critical Non-Critical Sub-Total Total

Compliant Partial (1) (0.5) 7 NA 15 0 22 0 22

NonCompliant 0 0

Not Applicable 5 3

Total Criteria 12 18

Applicable Criteria 7 15

30

22

No GAP was raised for partial and non-compliant indicators during the September 2013 assessment.

Recommendations: The following recommendations are stated as follows; Lebihasil Sdn. Bhd. has obtained 100% consistently for the past two years. It is therefore imperative that the licensee has to maintain and upkeep the good work that they have achieved thus far.

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING Report # G132039

FMU # 17A

Summary Highlights & Results – Maxland - FMU 17A Currently, Maxland focuses its forest activities on the tending and maintenance (pruning and slashing activities) of its planted areas at C70 and C71. Maxland Sdn. Bhd. (FMU 17A) has scored 100% in the recent TLAS assessment for the year 2013, with one previous Partial compliant C10.1 gap closed and no new gap has been raised. 4 observations were identified and raised during the audit and there are; 1. Maxland does not have trained personnel in Forest Protection by Wildlife Department, in stopping and mitigating forest encroachment, illegal poaching and illegal felling etc. 2. In accordance with SFMLA agreement, Maxland needs to prepare its Forest Fire Management Plan for FMU 17A. 3. It is observed that the waste material at its landfill site needs to be segregated between biodegradable and non-biodegradable. 4. Construction of diesel tank bunker needs to be improved, as the current bunker is not adequate to accommodate the volume in case of any spillage.

Results: During September 2013 TLAS assessment, the percentage of indicators showing full or partial compliant for Maxland Sdn. Bhd. (FMU 17A) was 100% and has complied with the Sabah TLAS to be classified as Verified Legal Compliant (VLC). The following table displays a breakdown of the various levels of compliance. Compliance Level Critical Non-Critical Sub-Total Total

Compliant Partial (1) (0.5) 7 NA 14 0 21 0 21

NonCompliant 0 0

Not Applicable 5 4

Total Criteria 12 18

Applicable Criteria 7 14

30

21

No GAP was raised for partial and non-compliant indicators during the September 2013 assessment.

Recommendations: The following recommendations are stated as follows; 1. Engage relevant authorities to conduct proper training related to forest protection activities. 2. To expedite the process of Forest Fire Management Plan for the licensed area. 3. Monitoring of waste disposal needs to be carried out on a regular basis. This is to ensure that the non-biodegradable and biodegradable are segregated properly. 4. Bunker at diesel tank area should be able to accommodate the spillage of diesel in the tank. Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING Report # G132040

FMU # 17B Area B

Summary Highlights & Results – Maxland - FMU 17B Area B Currently Maxland focuses its forest activities on the tending and maintenance (pruning and slashing activities) of its planted areas at FMU17B Area B. Maxland Sdn. Bhd. (FMU17B Area B) has scored 100% in the recent TLAS assessment for the year 2013, with one previous Partial compliant C10.1 gap closed and no new gap raised. 2 observations were identified during the audit: Maxland does not have trained personnel in Forest Protection by Wildlife Department, in stopping and mitigating forest encroachment, illegal poaching and illegal felling etc. In accordance with SFMLA agreement, Maxland needs to prepare its Forest Fire Management Plan for FMU 17B.

Results: During September 2013 TLAS assessment, the percentage of indicators showing full or partial compliant for Maxland Sdn. Bhd. (FMU 17B Area B) was 100%. The following table displays a breakdown of the various levels of compliance. Compliance Level Critical Non-Critical Sub-Total Total

Compliant Partial (1) (0.5) 7 NA 14 0 21 0 21

NonCompliant 0 0

Not Applicable 5 4

Total Criteria 12 18

Applicable Criteria 7 14

30

21

No GAP was raised for partial and non-compliant indicators during the September 2013 assessment.

Recommendations: 1. Engage relevant authorities to conduct proper training related to forest protection activities. 2. To expedite the process of Forest Fire Management Plan for the licensed area.

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING Report # G132041

FMU # 17B Area C

Summary Highlights & Results – Maxland - FMU 17B Area C Maxland Sdn. Bhd. has completed its planting activity within FMU 17B Area C in February of 2013. The main focus of its activities for the current year is to carry out maintenance on planted areas, such as tending activities at patches of natural forest, as well as to raise Eucalyptus hybrid for trial plot for future planting. The licensee has obtained an approval from Forestry Department for planting Eucalyptus hybrid at Area C (Ref. letter #: JPHTN/PP 700-2/1/2/KLT.9/19 dated 28 June 2012). One previous Partial compliant C10.1 gap is now closed and no new gap was raised, thus Maxland (FMU 17B Area C) has achieved 100% for September 2013 audit. 2 observations were identified and raised during the audit and there are; 1. Maxland does not have trained personnel in Forest Protection by Wildlife Department, in stopping and mitigating forest encroachment, illegal poaching and illegal felling etc. 2. In accordance with SFMLA agreement, Maxland needs to prepare its Forest Fire Management Plan for FMU 17B.

Results: During September 2013 TLAS assessment, the percentage of indicators showing full or partial compliant for Maxland Sdn. Bhd. (FMU 17B Area C) was 100% and has complied with the Sabah TLAS to be classified as Verified Legal Compliant (VLC). The following table displays a breakdown of the various levels of compliance. Compliance Level Critical Non-Critical Sub-Total Total

Compliant Partial (1) (0.5) 7 NA 14 0 21 0 21

NonCompliant 0 0

Not Applicable 5 4

Total Criteria 12 18

Applicable Criteria 7 14

30

21

No GAP was raised for partial and non-compliant indicators during the September 2013 assessment.

Recommendations: 1. Engage relevant authorities to conduct proper training related to forest protection activities. 2. To expedite the process of Forest Fire Management Plan for the licensed area. 3. Boundary demarcation along adjacent boundaries such as conservation areas, state land, and oil palm plantation needs to be visible and identifiable on the ground with clear paint markings and signage’s of forest reserve.

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING RIL Weekly Itinerary & Mandays – Sept 2013 Itinerary & Mandays: Tenom, Sook & Nabawan Districts Date Mon 2 Sept 2013 Tue 3 Sept 2013

Wed 4 Sept 2013

Activity Travel to Keningau, Opening meeting at RBJ Keningau

Fri 6 Sept 2013 7 Sept 2013 – 8 Sept 2013

(Total Mandays = 38)

GFS Staff Johari Abd Latif, Siti Radiah Mohamad, Salapan Amat, Jiron Janggil, Masrin Gilam, Dayang Hanisah Maidin Johari Abd Latif, Siti Radiah Mohamad, Salapan Amat, Jiron Janggil, Masrin Gilam, Dayang Hanisah Maidin

Field visit to Cmpt 3 Area A, Field visit to Block 1 Opening meeting at PPD Tenom, Field visit to Cmpt H(B)

Mandays 6

6

Johari Abd Latif, Masrin Gilam, Dayang Hanisah Maidin

3

Siti Radiah Mohamad, Salapan Amat, Jiron Janggil Johari Abd Latif, Siti Radiah Mohamad, Salapan Amat, Jiron Janggil, Masrin Gilam, Dayang Hanisah Maidin Johari Abd Latif, Siti Radiah Mohamad, Salapan Amat, Jiron Janggil, Masrin Gilam, Dayang Hanisah Maidin

Field visit to C321 Thurs 5 Sept 2013

2 – 6 Sept 2013

Documentation & Data analysis Closing meeting at PPD Keningau, Travel to Sandakan C321 - Report G110-650, C3 Area A - Report G110-651, Block 1 - Report G110-652, H(B) - Report G110-653,

3 6

6

Kevin Grace, Johari Abd Latif

8

Total

38

Itinerary & Mandays: Kinabatangan District (FMU 20)

09 Sept – 13 Sept 2013

(Total Mandays=41)

DATE

ACTIVITIES

GFS STAFF Johari Abd Latif, Mohd Akram Mansur, Franklin Emang, Salapan Amat, Dayang Hanisah Maidin, Jiron Janggil, Masrin Gilam

Mandays

09 Sept 2013 Mon

Travel to Luasong

10 Sept 2013 Tues

Opening meeting at Maxland Base Camp (Kuamut), Field visit to C41 & C479

Johari Abd Latif, Mohd Akram Mansur, Franklin Emang, Salapan Amat, Dayang Hanisah Maidin, Jiron Janggil, Masrin Gilam

7

11 Sept 2013 Wed

Field visit to CS3

Johari Abd Latif, Mohd Akram Mansur, Franklin Emang, Salapan Amat, Dayang Hanisah Maidin, Jiron Janggil, Masrin Gilam

7

12 Sept 2013 Thurs

Documentation

Johari Abd Latif, Mohd Akram Mansur, Franklin Emang, Salapan Amat, Dayang Hanisah Maidin, Jiron Janggil, Masrin Gilam

7

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

7

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING 13 Sept 2013 Fri 14 – 15 Sept 2013

Closing meeting at RBJ Lahad Datu, Travel to Sandakan C41: Report G110-654, C479: Report G110-655, CS3: Report G110-656

Johari Abd Latif, Mohd Akram Mansur, Franklin Emang, Salapan Amat, Dayang Hanisah Maidin, Jiron Janggil, Masrin Gilam

7

Kevin Grace, Johari Abd Latif

6

Total

41

17 Sept 2013 – 20 Sept 2013 (Total Mandays = 42) GFS Staff Mandays Johari Abd Latif, Bernd Hahn- Schilling, Mohd Travel to Millian, Akram Mansur, Franklin Emang, Salapan 9 Opening meeting Amat, Jiron Janggil, Masrin Gilam, Siti Radiah Mohamad, Dayang Hanisah Maidin Johari Abd Latif, Jiron Janggil, Masrin Gilam, Field visit to C157 & C172 5 Siti Radiah Mohamad, Dayang Hanisah Maidin Bernd Hahn- Schilling, Mohd Akram Mansur, Field visit to C589 4 Franklin Emang, Salapan Amat Johari Abd Latif, Bernd Hahn- Schilling, Mohd Documentation & Data Akram Mansur, Franklin Emang, Salapan 9 analysis (PPD Tongod) Amat, Jiron Janggil, Masrin Gilam, Siti Radiah Mohamad, Dayang Hanisah Maidin Johari Abd Latif, Bernd Hahn- Schilling, Mohd Closing meeting, Akram Mansur, Franklin Emang, Salapan 9 Travel to Sandakan Amat, Jiron Janggil, Masrin Gilam, Siti Radiah Mohamad, Dayang Hanisah Maidin C589 Report G110-657, C157 Report G110-658, Kevin Grace, Johari Abd Latif 6 C172 Report G110-659 42

Itinerary & Mandays: Tongod District Date Activity Tue 17 Sept 2013

Wed 18 Sept 2013

Thurs 19 Sept 2013

Fri 20 Sept 2013 21 Sept – 22 Sept 2013 Total

Itinerary & Mandays: FMU 24 ; Rakyat Berjaya DATE 23 Sept 2013 Mon

24 Sept 2013 Tues

ACTIVITIES Travelling to Tawau, Opening meeting at RBJ Tawau, Document review Field visit C193

23-26 Sept 2013 (Total Mandays= 44)

GFS STAFF Johari Abd. Latif, Bernd Hahn Schilling, Kevin Grace, Mohd. Akram Mansur, Franklin Emang, Salapan Amat, Siti Radiah Mohamad, Dayang Hanisah Maidin, Masrin Gilam, Jiron Janggil Johari Abd. Latif, Bernd Hahn Schilling, Kevin Grace, Mohd. Akram Mansur, Franklin Emang, Salapan Amat, Siti Radiah Mohamad, Dayang Hanisah Maidin, Masrin Gilam, Jiron Janggil

MANDAYS

10

10

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING 25 Sept 2013 Wed

Field Visit C424

26 Sept 2013 Thurs

Document review and Data analysis Closing meeting at RBJ Tawau, Travel to Sandakan

Johari Abd. Latif, Bernd Hahn Schilling, Kevin Grace, Mohd. Akram Mansur, Franklin Emang, Salapan Amat, Siti Radiah Mohamad, Dayang Hanisah Maidin, Masrin Gilam, Jiron Janggil

C192 : Report G110-670, C193 : Report G110-671,

Kevin Grace; Johari Abd. Latif, Bernd Hanh Schilling

27-28 Sept 2012

Johari Abd. Latif, Bernd Hahn Schilling, Kevin Grace, Mohd. Akram Mansur, Franklin Emang, Salapan Amat, Siti Radiah Mohamad, Dayang Hanisah Maidin, Masrin Gilam, Jiron Janggil

Total

10

10

4 44

TLAS Itinerary & Mandays – Sept 2013 Itinerary & Mandays: DATE

KM Hybrid (FMU 11)

2-5 Sept 2013

Total Mandays =10

ACTIVITIES

GFS STAFF

Mandays

2 Sept 2013 Mon

Travel from Sandakan to Keningau

Lai Jia Woei; Franklin Emang

2

3 Sept 2013 Tues

Opening meeting, field visit to KM Hybrid Plantation

Lai Jia Woei; Franklin Emang

2

4 Sept 2013 Wed

Document review, safety evaluation and preparation for closing meeting

Lai Jia Woei; Franklin Emang

2

5 Sept 2013 Thurs

Closing meeting and Travel back to Sandakan

Lai Jia Woei; Franklin Emang

2

Reporting G132-036

Kevin Grace, Lia Jia Woei,

2

6-7 Sept 2013 Total

10

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011

GLOBAL FORESTRY SERVICES (M) SDN BHD Kuala Lumpur : 31-9-1, Bangsar Heights, Jalan Kaloi, 59100 Kuala Lumpur Tel : +6089 226 857 Fax : +603 2283 5070 Sabah Branch : Block B, Ground Floor, Lot No. 6, Phase IIA, Taman Grandview, 90000 Sandakan, Sabah Tel : +6089 226 857 Fax: +6089 227 857 Email : [email protected] Website : www.gfsinc.biz

REDUCED IMPACT LOGGING

Itinerary & Mandays: DATE

Lebihasil & Maxland (FMU 17A &B)

9-13 Sept 2013

Total Mandays =25

ACTIVITIES

GFS STAFF

Mandays

9 Sept 2013 Mon

Travel to Tongod, Opening Meeting and Document Review – Lebihasil

Lai Jia Woei; John Baxter; Siti Radiah

3

10 Sept 2013 Tues

Site visit to FMU 17A & 17B - Lebihasil

Lai Jia Woei; John Baxter; Siti Radiah

3

11 Sept 2013 Weds

Safety evaluation & closing meeting – Lebihasil Opening Meeting and Document Review Maxland

Lai Jia Woei; John Baxter; Siti Radiah

3

12 Sept 2013 Thurs

Site visit to FMU 17A & 17B - Maxland

Lai Jia Woei; John Baxter; Siti Radiah

3

13 Sept 2013 Friday

Document Review; safety evaluation and Closing Meeting for Maxland & Travel to Sandakan

Lai Jia Woei; John Baxter; Siti Radiah

3

14-15 Sept 2013

Lebihasil 17A Report - G132-037 Lebihasil 17B Report - G132-038 Maxland 17A Report - G132-039 Maxland 17B Area B Report - G132-040 Maxland 17B Area C Report - G132-041

Kevin Grace, Lia Jia Woei,

10

Total

25

Document Control Doc #: G110-007

Title: RIL Summary Report

Issue: 02

Date: 1 Aug 2011