sanitary / plumbing permit date of application date issued ... grease trap bar sink ... deep well & pump set septic vault/imhoff tank street canal
FEDERAL REPUBLIC OF NIGERIA No. APPLICATION FORM FOR VISA/ENTRY PERMIT This form must be completed in full. Your application may be rejected for wrong and misleading information
We will process your application only when we receive all the information and documents we need. If you do not send all the required information, we will return your application. You can use this form to apply for a visa/permit for a single applicant
secured. 3. This Permit must be kept in the premises of the establishment wherein the sign is installed for inspection purposes. It may be cancelled or revoked pursuant to Sections 305 and 306 of the National Building Code (PD 1096), The City Ordinan
Republic of the Philippines ... PLUMBING ELECTRONICS INTERIORS OTHERS (Specify) ... CITY/MUNICIPALITY ZIP CODE TELEPHONE NO
ARCHITECTURAL PERMIT. ... 1.That under Article 1723 of the Civil Code of the Philippines, the architect (and engineer) ... PLUMBING 1OF2.cdr
building permit date of application ... use or type of occupancy industrial residential
2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in conformity with the latest National Structural Code of the Philippines, the National Building Code and its IRR. 3
OFFICE OF THE BUILDING OFFICIAL
MECHANICAL PERMIT Application No.
MP No.
Building Permit No.
Box 1 (To be accomplished in print by the Owner/Applicant) LAST NAME
OWNER/APPLICANT FOR CONSTRUCTION OWNED BY AN ENTERPRISE NO. ADDRESS
Box 2 (To be accomplished by the Design Professional) INSTALLATION AND OPERATION OF: BOILER
CENTRAL AIRCONDITIONING
PRESSURE VESSEL
MECHANICAL VENTILLATION
INTERNAL COMBUSTION ENGINE
ESCALATOR
REFRIGERATION MAKING
MOVING SIDEWALK
COMPRESSED AIR, VACUUM, INSTITUTIONAL AND/ INDUSTRIAL GAS
WINDOW TYPE AIRCONDITIONING
FREIGHT ELEVATOR
PACKAGED/SPLIT TYPE AIRCONDITIONING
PASSENGER ELEVATOR
PNEUMATIC TUBES, CONVEYORS AND/OR MONORAILS
OTHERS (Specify)
CABLE CAR
DUMB WAITER PUMPS
FUNICULAR
PREPARED BY
Box 3
Box 4
DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS
SUPERVISOR / IN-CHARGE OF MECHANICAL WORKS PROFESSIONAL MECHANICAL ENGINEER
PROFESSIONAL MECHANICAL ENGINEER
(Signed and Sealed over Printed Name)
(Signed and Sealed over Printed Name)
Date
Date Address PRC No. PTR No. Issued at Box 5 Building Owner
Address Validity PRC No. PTR No. Date Issued Issued at TIN Box 6 WITH MY CONSENT LOT OWNER
Validity Date Issued TIN
(Signature Over Printed Name) Date Address CTC No.
Date Issued
MECHANICAL ENGINEER
(Signature Over Printed Name) Date Place Issued
Address CTC No.
Date Issued
Place Issued
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION
Box 6 DATE
RECEIVED BY
FIVE (5) SETS OF MECHANICAL DOCUMENTS MECHANICAL PLANS AND SPECIFICATIONS
COST ESTIMATES
OTHERS (Specify)
BILL OF MATERIAL
Box 7 PROGRESS FLOW IN
OUT
PROCESSED BY: DATE
TIME
DATE
TIME
MECHANICAL
CARIDAD J. MANIPON
OTHERS (Specify)
Chief, Building Code Section
Box 9 ACTION TAKEN PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING: 1. That the proposed mechanical works shall be in accordance with the mechanical plans filed with this Office and in conformity with the provisions of the latest Philippine Mechanical Codes, the National Building Code and its IRR. 2. That prior to any mechanical installation, a duly accomplished prescribed “Notice of Construction” shall be submitted to the Office of the Building Official. 3. That upon completion of the mechanical works, the licensed supervisor/in-charge shall submit the entry to the logbook duly signed and sealed to the Building Official, including as-built plans and other documents and shall also accomplish the Certificate of Completion stating that the mechanical works conform to the provisions of the Philippine Mechanical Code, the National Building Code and its IRR. 4. That this permit is null and void unless accompanied by the building permit. 5. That a Certificate of Operation shall be issued for the continuous use of mechanical installations.
PERMIT ISSUED BY:
MACARIO A. SEGUNDO JR. City Engineer/Building Official