SUMMARY OF NRM WORKS VILLAGE WISE

Details of NRM works – Project IWMP 7 – Part II ... SUMMARY OF NRM WORKS – VILLAGE WISE . Details of NRM works – Project IWMP 7 – Part II 2 SUMMARY OF...

0 downloads 67 Views 672KB Size
Details of NRM works – Project IWMP 7 – Part II

SUMMARY OF NRM WORKS – VILLAGE WISE

1

Details of NRM works – Project IWMP 7 – Part II

SUMMARY OF AVAILABILITY OF FUNDS FOR NRM WORKS UNDER IWMP AND FUNDS REQUIRED FOR WORKS NAME OF PROJECT IWMP 7 PIA: DSCO, HOSHIARPUR Funds available under Funds required Difference Sr.No. Name of village IWMP in lacs in lacs in lacs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total

Chak Mirpur Chak Pandian Shri Pandian Changarwan Adampur Motian Ulaha Handwal Rauli Namoli Sathwan Fatehpur Beh Mawa Gwal Chak Shangaroo Bhatoli Dharampur Amroh Batwara Alera Bhol Badmania

23.18

23.19 8.34 6.75 32.62 7.37 4.4 16.13 6.45 21.51 26.1 9.42 18.47 3.04 10.47 36.87 13.44 15.21 19.84 39.43 319.05

15.12 32.59 7.39 4.44 16.13 6.45 21.5 26.07 9.41 18.48 3.02 10.48 36.96 13.51 15.19 19.82 39.31 319.05

2

-0.01 0.03 -0.03 0.02 0.04 0 0 -0.01 -0.03 -0.01 0.01 -0.02 0.01 0.09 0.07 -0.02 -0.02 -0.12 0

Details of NRM works – Project IWMP 7 – Part II

3

Details of NRM works – Project IWMP 7 – Part II

DETAILS OF NRM WORKS IDENTIFIED

4

Details of NRM works – Project IWMP 7 – Part II

Funds for NRM under IWMP in lacs

1. Name of village: Chak Mirpur Type of structure/work

Nos.

1

Laser Levelling

30

2

Under Ground Pipe Line 8" dia

950

3

Under Ground Pipe Line 6" dia

4

Under Ground Pipe Line 6" dia

Sr.No.

5

Crate Wire structures

Length in metres

Breadth in metres

Height/depth

unit

Contents in cum

Rate

Total cost

Benefi ciaries

23.18 Impact

ha

16000

480000

15 farmers

Water saving

Extension from existing source -Shah Nehar right side

Mts.

690

655500

30 farmers

25 ha land will come under irrigation

875

Extension from existing source -RD 3200

Mts.

475

415625

25 farmers

20 ha land will come under irrigation

370

Extension from existing sources

Mts.

475

175750

15 farmers

10 ha land will come under irrigation

Ist step

3.50*1.50*.75

3.95

2nd step

3.25*1*1

3.25

15 farmers

35

cum Total

5

7.2

2350

592200 2319075

20 ha land will come under irrigation

Details of NRM works – Project IWMP 7 – Part II 2.

Name of village: Chak Pandian

Sr.No.

Type of structure

Nos.

1

LAND LEVELLING

6

2

Open channel

3

Retaining wall

Funds for NRM under IWMP in lacs

Length in metres

Breadth in metres

Height/depth

Unit

Contents in cum

ha

1

16000

70

1

1.1

77

70

0.75

2

105

1st and 2nd step as above

cum

Rate

182

4000

Total Shri Pandian WORKS IDENTIFIED UNDER NRM FOR THIS VILLAGE TOTAL 3. Name of village: Shri Pandian Length Type of in Breadth in Sr.No. structure Nos. metres metres Land 1 Levelling 8 Retaining 2 wall 38 1 38

Total cost

Beneficiaries

15.12 Impact

96000

various farmers

Water saving

10000

2 farmers

2 ha of land

Common work

PRI land

728000 834000 674646 1508646

Heigh t/dept h Unit

Conten ts in cum

ha 1 1.2

cum

Rate 16000

Total cost 128000

Beneficia ries Various farmers

Impact Water saving

283328

Common work

PRI land

26438

Various farmers

Saving 2 ha of land

38 32.83 70.83

4000

1st and 2nd step as above

3

Crate Wire structures

3

3

1

1.25 6

cum

3.75

2350

Details of NRM works – Project IWMP 7 – Part II Ist step 2nd step

Crate Wire structures

4

3.50*1.50*.75

3.95

3.25*1*1

3.25

14

cum

7.2

2350

Total

4. Name of village: Changarwan Sr.No.

1

2

3

4

5

Type of structure/work

Land Levelling Under ground pipeline 6 " dia Under ground pipeline 6 " dia Under ground pipeline 8 " dia Renovation of pond Total

Nos.

Length in metres

Breadth in metres

236880 674646

Funds for NRM under IWMP in lacs Height/depth

40

Unit

ha

Contents in cum

Rate

16000

Total cost

Beneficiaries

640000

Various farmers

1500

Extension from existing source - From Shah Nehar both sides

mts.

475

712500

30 farmers

1000

Extension from existing sourceFrom Jhaal No.2 left side

mts.

475

475000

25 farmers

1500

Extension from existing sourceFrom Jhaal No.2 right side

mts.

690

1035000

30 farmers

400000

Common work

1

Nos.

3262500

7

Various farmers

Saving 10 ha of land

32.59 Impact

Water saving 30 ha of agri land would come under irrigation 25 ha of agri land would come under irrigation 35 ha of agri land would come under irrigation Water Conservation

Details of NRM works – Project IWMP 7 – Part II

8

Details of NRM works – Project IWMP 7 – Part II 5. Name of village: Adampur Motian Sr.No.

Type of structure/work

1

Land Levelling

2

Underground pipe line 6" dia

Nos.

Length in metres

Breadth in metres

Funds for NRM under IWMP in lacs Height/depth

6

Unit

ha

1350

Extension from existing source - From Shah Nehar

Total

mts.

Contents in cum

Rate

16000

475

Total cost

Impact

96000

3 farmers

Water Saving

641250

Various farmers

40 ha of agri land would come under irrigation

737250

9

Beneficiaries

7.39

Details of NRM works – Project IWMP 7 – Part II 6. Name of village: Ulaha Sr.No.

Type of structure/work

1

Land levelling

2

Retaining Wall

Nos.

Length in metres

Funds for NRM under IWMP in lacs

Breadth in metres

Height/depth

4

1

3

9

Contents in cum

ha 1

1

15

15

0.75

1.5

17 cum

3

1

1.25

Ist step 3.50*1.50*.75 2nd 3.25*1*1 step Alongwith choe near crematorium

Rate

16000

14

1st step and 2nd step as above Crate Wire structrures

Unit

32

3.75

4000

4.44

Total cost

Benefici aries

64000

6 farme rs

Water saving

PRI

2 acres

Impact

127500

2350

79313

Variou 10 ha land s saved and check farme in soil erosion rs

2350

169200

10 ha land saved and check in -soil erosion

3.95 cum

3.25

cum

7.2

1st step and 2nd step as above 4

Crate Wire structures

10

440013 10

Details of NRM works – Project IWMP 7 – Part II 7. Name of village: Handwal Sr.No.

Type of structure

Nos.

1

Land levelling

12

2

Underground pipe line 8"

490

3

Underground pipe line 6"

4

Retaining wall

Length in metres

Breadth in metres

Extension from existing source -Canal

Contents in cum

192000

mts.

690

338100

mts.

475

45

45

72

1.2

38.88 cum

83.88

3.50*1.50*.75

3.95

3.25*1*1

3.25 cum

Total

Total cost

16000

1

20

Rate

ha

1

Ist step 2nd step

Crate wire structures

Unit

45

1st and 2nd step as above

5

Height/depth

Extension from existing source -Perrenial flow

860

1

Funds for NRM under IWMP in lacs

7.2

4000

335520

2350

338400

Impact

Various farmers

Water saving

Common work

20 ha of land would come under irrigationn Saving PRI land

408500

1612520

11

Beneficiaries

16.13

Various farmers

saving 8 ha of land

Details of NRM works – Project IWMP 7 – Part II 8. Name of village: Rauli Sr.No.

Type of structure

Nos.

1

Land levelling

8

2

Underground pipeline 8 "

314

3

Renovation of perennial flow

1

4

Drain cleaning

Length in metres

Breadth in metres

Funds for NRM under IWMP in lacs Height/depth

Extension from existing source - own tubewells

Unit

Rate

Total cost

Beneficiaries

Impact

Water saving 20 ha of land would come under irrigation

ha

16000

128000

Various farmers

mts.

690

216660

Various farmers

Nos.

In two times

Contents in cum

200000 100000 644660

12

6.45

Details of NRM works – Project IWMP 7 – Part II 9. Name of village: Namoli Sr.No.

1

2

Type of structure/work

Land Levelling Under ground pipeline 6" dia

3

Under ground pipeline 6" dia

4

Renovation of pond

5

Retaining Wall

Nos.

Length in metres

Breadth in metres

Height/depth

Unit

10

490

Extension from existing sourcePSTC

350

Extension from existing sourceKandi Canal

1

Funds for NRM under IWMP in lacs

21.5

Benefic iaries

Impact

Contents in cum

Rate

10 farmers

Water saving

166250

40 farmers

25 ha of agri land would come under irrigation

160000

Common work

Water conservation

36

Chain Singh, Sukraj and others

Field Protection

36

Chain Singh, Sukraj and others

Field Protection

Chain Singh, Sukraj and others

Field Protection

ha

16000

160000

Mts.

475

232750

Mts.

475

Pukhar Mohalla

40

0.9

1

Total cost

cum

1 6

Retaining Wall

40

0.75

1st and 2nd step as above 7

Run off control structures

1.2

cum

72

8

25

13

4000

3800

288000

760000

Details of NRM works – Project IWMP 7 – Part II

8

9

Retaining Wall

Crate Wire structures

1

6

35

1

1

35

35 1st and 2nd step as above

0.75

1.5

39

Ist step

3.50*1.50*.75

3.95

2nd step

3.25*1*1

3.25

74

7.2 Total

4000

2000

297500

Common work

86400

Chain Singh, Sukraj and others

2150900

14

Field Protection

Details of NRM works – Project IWMP 7 – Part II 10. Name of village: Sathwan Sr.No.

Type of structure

Nos.

1

Land levelling

30

2

Retaining wall

1

3

Underground pipeline 8"

650

4

Underground pipeline 8"

315

5

Diversion channel waste water disposal

6

Crate wire structures

Length in metres

Funds for NRM under IWMP in lacs

Breadth in metres

Height/depth

Unit

Contents in cum

ha

Total cost

Beneficiaries

Impact

16000

480000

Various farmers

Water saving

4000

120000

PRI

4 kanals saving of land

22

cum

Extension from existing source

mts.

690

448500

mts.

690

217350

8"

30

Rate

26.07

75000

Various farmers

40 ha of land would come under irrigation

Saving land from getting damaged 4 ha Check in soil erosion and saving land to the tune of 50 ha

75

3.5 3.25

1.5 1

0.75 1 cum

1st and 2nd step as above

3.94 3.25 7.2

2350

1266797 2607647

15

Details of NRM works – Project IWMP 7 – Part II

11. Name of village: Fatehpur

Funds for NRM under IWMP in lacs

Sr.No.

Type of structure

Nos.

Length in metres

Breadth in metres

1

Roof Rainwater harvest structure

1

3

3

2

Underground pipeline 6"

200

3

Crate wire structures

39

Height/depth

Unit

2

Nos.

Extension from existing source Govt.Tubewell

3

Contents in cum

80000

Mts.

1

Rate

1.25 cum 3.75

Total cost

80000

Beneficiaries

9.41 Impact

Govt.school

Water conservation

475

95000

Various farmers

30 ha land would come under irrigation

2350

343688

Various farmers

Saving 15 ha of land

2350

423000

Khad near Mistri Mohalla, Chanan Mohalla,Kumahar Mohalla 4

Crate wire structures

25

3.5

1.50*.75

3.95

3.25 1st and 2nd step as above.

1*1

3.25 cum

7.2

Khad near Nama and Bakhshish Mohalla Total

941688

16

Saving 12 ha of land

Details of NRM works – Project IWMP 7 – Part II 12. Name of village: Beh Mawa Sr.No.

Type of structure

Nos.

Length in metres

Funds for NRM under IWMP in lacs

Breadth in metres

Height/depth

Unit

1

Underground pipeline 6"

400

2

Renovation of pond

1

120

Base width 0.45+0.50

1.5

Nos.

3

Crate Wire structures Single step

60

3

1

1.25

cum

Extension from existing bores-Beh Mawa 1 & 2

Contents in cum

Rate

Total cost

18.48 Beneficiaries

475

190000

10 farmers

210

4000

840000

Common work

3.75

2350

528750

40 farmers

mts

Impact

20 ha land would come under irrigation Water Conservati on Saving 40 ha of land

In the area of 4 kms. 4

Crate Wire structures Double steps

20

Saving 20 ha of land

In the area of 4 kms. 3.50*1.50* .75 3.25*1*1 1st and 2nd step as above

3.95 3.25 cum

7.2

2000

288000 184675 0

Total

17

15 farmers

Details of NRM works – Project IWMP 7 – Part II 13. Name of village: Gwal Chak Sr.No.

Type of structure

Nos.

1

Land levelling

5.5

2

Retaining wall-Stone Masonary

1

Length in metres

Breadth in metres

Funds for NRM under IWMP in lacs Height/depth

Contents in cum

Unit

Mts.

70

0.7

1.1

cum

53.9

Rate

Total cost

Beneficiaries

16000

88000

8 farmers

4000

215600

Total

Sr.No.

1

2 3 4

Type of structure/work

Nos.

300

Length in metres

Name of village

Bhatoli

Breadth in metres

Height/depth

Unit

1

1.25

cum

Extension from existing source-Govt. tubewell

11 1

Impact

Water saving To check soil erosion

303600

Crate wire 30 3.5 structures To drain out sludge water Undergrojnd pipeline 6" dia Land levelling Retaining wall-Stone masonary

3.02

Funds for NRM under IWMP in lacs Contents in cum

4.375

Mts. ha

150

0.7

1

cum

105

Rate

Total cost

2350

308438

475

142500

16000

176000

4000

420000

Retaining wall near school ground to protect fields Total

1046938

18

10.48

Beneficiaries

Impact

Various farmers

Check in soil erosion, water saving and more area would come under irrigation

Details of NRM works – Project IWMP 7 – Part II 14. Village: Dharampur Sr.No.

1

2 3

Type of structure/work

Roof rain water harvest structures Field Bunding Run off control structures

Funds for NRM under IWMP in lacs Nos.

Length in metres

Breadth in metres

Height/depth

Unit

2

3

3

2

Nos.

80000

160000

mts.

70

73500

1050 3

1.5

cum

270

4000

1080000

5

3

2

cum

210

4000

840000

6

1

3

18

6

0.7

1

4.2

7

5

Stone Masonry Retaining wall

4 Ist step 2nd step

cum

7

Total cost

5

Run off control structures

Renovation of well

Rate

12

4

6

Contents in cum

22.2

1 Ist step 2nd step

Crate wire structures

16*1.5*.1

1.25

4000

355200

50000

50000

2350

1128000

24

16.*1*1

16

12

40

ACROSS THE CHOE - MAIN KHAD BHOL BADMANIA - AGRI LAND ON BOTH SIDES OF KHAD Total

3686700

19

Beneficiaries

36.96 Impact

Two households

Water conservation

Various farmers

Protecting agri land 50 ha, checking soild erosion and water conservation

Details of NRM works – Project IWMP 7 – Part II 15. Village: Amroh Sr.No.

1

3

Type of structure/work

Roof rain water harvest structures Run off control structures

Funds for NRM under IWMP in lacs Nos.

Length in metres

Breadth in metres

Height/depth

Unit

1

3

3

2

Nos.

2

6

3

1.5

cum

5

3

2

cum

7

1

3

21

7

0.70

1

4.9

4

Run off control structures

2

5

Stone Masonry Retaining wall

1 Ist step 2nd step

cum 6

Crate wire Retaining walls

1st step 2nd step 12

Contents in cum

Rate

Total cost

80000

80000

54

4000

216000

60

4000

240000

10

1.5

1

25.9 15

10

1

1

10 25

4000

103600

2350

705000

ACROSS THE CHOE - MAIN KHAD OF BATWARA AND NUMBER OF SMALL CHOES - AGRI LAND ON BOTH SIDES OF KHAD Total

1344600

20

13.51

Beneficiaries

Impact

Two households

Water conservation

Various farmers

Check in soil erosion, saving land - approx. 20 ha

Details of NRM works – Project IWMP 7 – Part II 16. Village: Batwara

Funds for NRM under IWMP in lacs

Sr.No.

Type of structure/work

Nos.

Length in metres

Breadth in metres

Height/depth

Unit

1

Run off control structures

3

5

3

1.5

cum

67.5

4000

270000

4

5

3

2

cum

120

4000

480000

125000

125000

2 3

5

Run off control structures Renovation of Main village Pond Crate wire structures

Contents in cum

1

Retaining wall

Ist step 2nd step 10

11

1.5

1

16.5

11

1

1

11 27.5

Rate

Total cost

Various farmers

2350

646250

ACROSS THE CHOE - JAURA BAHADUR - JUNGLE SIDE AND KHAD SIDE - AGRI LAND ON BOTH SIDES OF KHAD Total

1521250

21

Beneficiaries

15.19 Impact

Check in soil erosion, saving land and water conservation

Details of NRM works – Project IWMP 7 – Part II 17. Village: ALERA Sr.No.

1

2 3

Type of structure/work

Roof rain water harvest structures Field Bunding Run off control structures

Funds for NRM under IWMP in lacs Nos.

Length in metres

Breadth in metres

Height/depth

Unit

2

3

3

2

Nos.

80000

160000

mts.

70

18200

260

Total cost

3

3

1.5

cum

148.5

4000

594000

5

3

2

cum

120

4000

480000

7

1

3

21

7

0.7

1

4.9

Run off control structures

4

5

Stone Masonry Retaining wall

1 Ist step 2nd step

cum

7

Rate

11

4

6

Contents in cum

Renovation of Pond

1

Crate wire structures

Ist step 2nd step 10

25.9

9

1.5

1

13.5

9

1

1

9 22.5

4000

103600

100000

100000

2350

528750

ACROSS THE CHOE - MAIN KHAD ALERA AND DHARAMPUR KHAD NEAR WATER WORKS, near SC Mohalla - AGRI LAND ON BOTH SIDES OF KHAD Total

1984550

22

Beneficiaries

19.82 Impact

Four households

Water conservation

Various farmers

Protecting agri land 30 ha, checking soil erosion and water conservation

Details of NRM works – Project IWMP 7 – Part II 18. Village: Bhol Badmania

Funds for NRM under IWMP in lacs

Sr.No.

Type of structure/work

Nos.

Length in metres

Breadth in metres

Height/dept h

Unit

1

Run off control structures

15

5

3

1.5

cum

337.5

4000

1350000

2

Run off control structures

8

5

3

2

cum

240

4000

960000

3

Stone Masonry Retaining wall

4 6

1

3

18

6

0.7

1

4.2

Ist step 2nd step

cum 4

5

Renovation of Pond

Contents in cum

22.2

1

Crate wire structures

Ist step

16*1.5*. 1

2nd step

16.*1*1

1.25

Rate

Total cost

4000

355200

150000

150000

2350

1128000

24 16

12

40

ACROSS THE CHOE - MAIN KHAD BHOL BADMANIA - AGRI LAND ON BOTH SIDES OF KHAD Total

3943200

23

Beneficiaries

Various Farmers

39.31 Impact

Check in soil erosion, field protection, waterr conservatio n